Lagos cold-storage depot
- System
- 10 kW / 20 kWh storage
- Solar
- 12 kWp rooftop PV
- Commissioned
- March 2026
Challenge. Feeder outages and voltage dips were spoiling frozen stock, while diesel near ₦1,900–₦2,000/litre made backup power the depot's biggest controllable cost.
What we installed. One GS-GP10K storage generator with rooftop solar, an automatic transfer switch and surge protection. Installed over three days around the cold-room operating schedule.
100%
Diesel removed
-61%
Monthly energy spend
None
Stock losses since install
~28 months
Payback
“We used to plan our week around diesel deliveries. Now the cold rooms stay on through feeder trips and the noise is gone.”