Installations

Case studies from sites across Ghana

Clinics, hotels, cold stores, farms, shops and offices running on Gesung Green storage generators — what they needed, what we installed and what changed afterwards.

Industry Tema Free Zone Enclave, Greater Accra

Tema cold-storage depot

System
10 kW / 20 kWh storage
Solar
12 kWp rooftop PV
Commissioned
March 2026

Challenge. Daily grid interruptions were spoiling frozen stock and the site was burning roughly 90 litres of diesel a day to keep three cold rooms running.

What we installed. One GS-GP10K storage generator with rooftop solar, an automatic transfer switch and surge protection. Installed over three days with no downtime for the cold rooms.

100%

Diesel removed

-61%

Monthly energy spend

None

Stock losses since install

~28 months

Payback

We used to plan our week around fuel deliveries. Now the cold rooms simply stay on and the noise is gone.

Operations ManagerTema cold-storage depot
Healthcare East Legon, Accra

Private clinic, East Legon

System
5 kW / 10 kWh storage
Solar
6 kWp PV
Commissioned
January 2026

Challenge. Theatre lights, sterilisers and a vaccine fridge needed uninterrupted power, and the diesel standby unit took nearly a minute to pick up the load.

What we installed. GS-GP5000 sized for critical circuits with instant switchover, plus solar to carry the daytime load. Paid 60% upfront with the balance on our credit facility.

<20 ms

Switchover time

Zero

Cold-chain incidents

Eliminated

Generator fuel bill

2 days

Install time

Consultations no longer stop when the light goes off. The credit terms made it possible for us to do it this year instead of next.

Clinic AdministratorPrivate clinic, East Legon
Hospitality Kumasi, Ashanti Region

Boutique hotel, Kumasi

System
20 kW / 30 kWh storage
Solar
24 kWp PV
Commissioned
February 2026

Challenge. Guests were being woken by the diesel standby set, and air-conditioning surges tripped the old changeover panel.

What we installed. GS-GP20/30K with surge buffering for AC compressors and lifts, solar carrying daytime rooms, and night-time load covered from storage.

-100%

Noise complaints

40 kW

Peak surge handled

GHS 18,400

Monthly bill saving

Up 0.6 pts

Guest rating

The silence is the selling point. Guests ask what we changed, and we tell them we stopped using fuel.

General ManagerBoutique hotel, Kumasi
Retail Takoradi, Western Region

Retail parade, Takoradi

System
4 × 3 kW units
Solar
3 kWp PV per shop
Commissioned
December 2025

Challenge. Four small shops shared one unreliable generator, and each outage closed the tills and the freezers.

What we installed. One GS-GP3000 per shop with individual solar, so each tenant owns their own supply. Shops paid 50% upfront with the balance on credit.

100%

Trading hours kept

Ended

Shared-generator costs

1 day

Install per shop

50%

Upfront paid

My freezer has not gone off once since installation. The instalment plan meant I could start straight away.

Shop ownerRetail parade, Takoradi
Agriculture Tamale, Northern Region

Irrigation farm, Tamale

System
5 kW / 10 kWh storage
Solar
9 kWp PV
Commissioned
April 2026

Challenge. Pumping relied on petrol engines, with fuel hauled in weekly during the dry season and pumps idle whenever supply ran short.

What we installed. GS-GP5000 driving two irrigation pumps off solar during the day and storage in the early morning, sized during a site survey before installation.

None

Fuel deliveries

+4

Irrigated hours/day

+22%

Dry-season yield

-74%

Running cost

We irrigate on schedule now, not when fuel arrives. That alone changed our harvest.

Farm ManagerIrrigation farm, Tamale
Corporate Airport City, Accra

Corporate office, Airport City

System
10 kW / 20 kWh storage
Solar
15 kWp PV
Commissioned
May 2026

Challenge. A three-floor office with servers and 60 workstations needed clean, quiet backup that met the landlord's no-fuel-on-site rule.

What we installed. GS-GP10K in the plant room with rooftop solar, feeding server room, lighting and workstation circuits. 70% paid before installation, balance on credit.

0 minutes

Downtime since install

-58%

Grid units bought

None

Fuel stored on site

~11 tonnes

CO2 avoided/year

It passed the building's fuel rules and our IT team finally stopped worrying about the UPS runtime.

Facilities LeadCorporate office, Airport City